Purpose: Enter the results for your concrete tests.
- Cylinder # text box: Enter the cylinder number for the current test set.
- Truck # text box: Display the truck number for the current test set.
- Add Strength button: Add an Add Strength section to your current test set.
- Breaks section: Enter the break data for the current test set.
- Break Days button: Open the Break Days pop-up.
- Day selectors: Select what days your cylinders will be broken.
- Cancel button: Exit the Break Days pop-up without saving your entry.
- Accept button: Save your added break days and exit the pop-up.
- Technician drop-down: Select the technician who acquired the cylinders.
- Print Break Sheet button: Print the Break Sheet of the Fully Sunk Concrete report.
- Break Days button: Open the Break Days pop-up.
- Time Sampled section: Show the time and date the concrete was sampled.
- Date selector: Select and display the date the concrete was sampled.
- Time selector: Select and display the time the concrete was sampled.
- Now button: Set the Date and Time selectors to the current date and time.
- Equipment Settings section: Display the Equipment Settings.
- Air Meter text box: Enter and display the Air Meter Number.
- Calib Date selector: Select and display the date the air meter was last calibrated.
- Sample Locations Set Location button: Go to the Set Location page.
- Add Location button: Select the location you sampled your concrete from.
- Water Was Added Yes/No buttons: Select if water was added to the concrete.
- Air Was Added Yes/No buttons: Select if air was added to the concrete.
- % Air text box: Enter the percent air test results.
- Air Temp text box: Enter the air temperature test results.
- Concrete Temp text box: Enter the concrete temperature test results.
- Slump text box: Enter the slump test results.
- Unit Weight text box: Enter the unit weight test results.
- Batch Time time-selection box: Select when the batch time was.
- IA Sample Yes/No buttons: Select if an IA was done on the current report.
- IA With text box: Enter the name of the inspector the IA was done with.
- Connected Report ID text box: Enter the ID of the connected report.
- Notes section: Enter any notes on the concrete tests.
Help Center