Verify key components for the Concrete report you are creating

1 min. readlast update: 03.25.2025

1. Double-check that the Pay Item Group and Details sections are correct.

a. If you need to change a Pay Item Group for a report, see [cross-reference].

2. Double-check that any previously inputted equipment settings are correct.

a. If you need to change any equipment settings for a report, see [cross-reference].

3. Double-check that the date of the report is accurate for when the tests were taken.

 

Was this article helpful?